Project experience / Transmission / Northeastern BC
Dawson Creek to Chetwynd
74 km · 230 kV double circuit

R&R supported BC Hydro and SNC-Lavalin on the 74 km, 230 kV double-circuit Dawson Creek to Chetwynd line and three substations, addressing quality issues that threatened reliable operation. Acting as BC Hydro’s on-site QA/QC representative, the team inspected materials and field construction, reviewed deliveries, performed steel-pole factory inspections, witnessed manufacturing tests and provided daily reports. Issues affecting approximately 85% of the line’s steel-pole structures were resolved, and the lines and substations were commissioned on schedule.
Scope and results
Project and challenge
Support BC Hydro and SNC-Lavalin in resolving quality issues on 74 km of 230 kV double-circuit transmission line and three substations in northeastern BC. The issues required resolution to prevent serious failures.
Role and execution
- Act as BC Hydro’s on-site QA/QC representative.
- Inspect material and construction quality across the line, Dawson Creek, Bear Mountain and Sundance Lake substations, and the SLS Passive Reflector.
- Provide quality control for field activities.
- Perform factory inspections of steel-pole fabrication and witness tests at critical manufacturing steps.
- Provide daily QA/QC reports.
- Participate in material-delivery checks.
Results
- Issues affecting approximately 85% of the line’s steel-pole structures were satisfactorily resolved.
- The lines and substations were commissioned on schedule.