Project experience / Transmission / Northern BC
Brucejack Transmission Line
56 km · 138 kV




Brucejack required a 56 km, 138 kV steel-pole transmission line, two substations and a switching station across remote mountain terrain and glacier crossings exceeding 2 km. R&R cleared the right-of-way in seven winter weeks and acted as the owner’s site representative, managing construction coordination, QA/QC, field inspections, procurement monitoring and environmental oversight. Close coordination of crews, material deliveries and helicopter support enabled completion before mine startup, with no major construction issues or environmental incidents.
Scope and results
Project and challenge
Complete a 56 km steel-pole transmission line along the BC–Alaska border through remote, rugged terrain, including glacier crossings exceeding 2 km, within one short construction season. The project also included two substations and a switching station.
Role and execution
- Clear the entire right-of-way during winter in seven weeks.
- Act as the owner’s on-site representative for construction management and work coordination.
- Provide project-wide QA/QC and environmental monitoring.
- Complete final foundation walkdowns before pole erection.
- Oversee scheduling, cost and document control.
- Review contractor submissions and recommend awards.
- Witness grubbing, concrete placement, anchor drilling and installation, pull-out tests, pile installation, conductor stringing and sagging.
Results
- Close monitoring of procurement, construction and helicopter support enabled completion before mine startup without major issues.
- Quality assurance during material fabrication helped prevent defective items from arriving on site.
- Environmental monitoring supported work through sensitive areas without environmental incidents.